Iraqi Electricity: The smart transformation project ensures 24-hour power supply
Iraqi Electricity: The smart transformation project ensures 24-hour power supply
PM:07:14:04/02/2024
The Ministry of Electricity announced today, Sunday, that the smart transformation project will ensure the provision of energy around the clock, during its chairman’s meeting, which was chaired by the Minister of Electricity, Ziad Ali Fadel.
In a statement, a copy of which was received by NRT Arabic, the Ministry stressed the importance of these projects and the government’s emphasis on adopting them as a major turning point, noting that the efforts made included multiple studies and analyzes of projects in various regions.
Smart transformation and electronic collection procedures were reviewed, with the Minister stressing the importance of continuing with the necessary steps to reduce energy waste and improve services.
The statement explained that energy networks in several regions were studied and analyzed, and ten regions were selected to implement the first phase of the project, including the capital, Baghdad, and other governorates.
He added that a group of important topics were discussed, including the financial model that competing companies will present, as well as the added values and internal returns, adding that the focus was on improving networks and determining and reducing wastage rates, in addition to paying attention to calculating the prepared and lost energies and determining the time ceilings for dealing. with her.
The Ministry stressed that the project will ensure the provision of energy and full service 24 hours a day without an increase in the cost of the tariff, and will aim to support citizens with middle and limited incomes, and improve control and regulation of high loads.
nrttv.com